When will RAM prices go down?
Nobody can date the turn — but the signals that move first are all on this page.
Quick answer: as of 2026-11-20, DDR5 16Gb (2Gx8) 4800/5600 is $61.26 USD / die, +4.66% over 30 days and +484.00% year over year. Across the 6 contracts tracked on this page the basket is +11.40% over 30 days and +405.83% year over year.
Memory cycles end when bit supply catches demand, and that is a manufacturing timeline, not a sentiment one: seven to nine quarters from a new fab's tool-in to meaningful output, with much of the new capacity pre-committed to HBM. The turn shows up in a fixed order — spot before contract, dies before modules, modules before retail kits. Track the 30-day column below across the die rows; that is the leading edge.
Last updated
Price explorer
Rebased to 100 at series start — compare moves across incompatible units.
Products — HBM3E-36G, DDR5-16G, DDR4-8G, RTL-32G4/6 selected ▾
Pick up to six products to plot. All segments · 53 available.
Tracked contracts
6 contracts · basket 30d +11.40% · basket YoY +405.83%
| Contract | Spot | Daily H / L | Session H / L | 30d | YoY | Chart | Source |
|---|---|---|---|---|---|---|---|
DDR5-16G DDR5 16Gb (2Gx8) 4800/5600 2 Nov session average, unchanged on the day. Some buyers raised targets under delivery pressure, but high component costs limit price-chasing. USD / die | $61.26 | $62.73 $59.18 | $62.73 $54.48 | +4.66% | +484.00% | Chart ↗ | DRAMeXchange / TrendForce spot board reported · 2026-11-02 |
DDR5-16G-eTT DDR5 16Gb (2Gx8) eTT Untested die. The eTT-to-branded gap is the cleanest read on how tight qualified supply is. USD / die | $28.98 | $29.83 $28.37 | $29.83 $25.49 | +14.99% | +330.00% | Chart ↗ | DRAMeXchange / TrendForce spot board reported · 2026-10-22 |
DDR4-16G DDR4 16Gb (2Gx8) 3200 2 Nov session average, down 0.09%. Spot sits above suppliers' official quotes and buyers expect a correction, so volume has shrunk. USD / die | $82.59 | $85.75 $79.48 | $85.75 $73.34 | -1.57% | +686.00% | Chart ↗ | DRAMeXchange / TrendForce spot board reported · 2026-11-02 |
Starter & Pro Unlock 3 more prices Full price board, every contract and the Semis tracker — Starter $9/mo, Pro $19/mo. ⤓ Export the full series: CSV + API on Starter, Excel .xlsx on Pro | |||||||
Daily H/L is the current quote day's range; session H/L is the trailing 30-day quoting window. Last updated .
Get the When RAM prices go down moves every Monday — week-over-week and year-over-year on the contracts above, plus the three headlines that moved a price.
What changed this month
Computed from the rows above · session 2026-11-20
The leading edge. Dies turn before modules and long before retail kits.
Lags the die board by roughly four to eight weeks in both directions.
A turn needs most of this basket negative for several consecutive readings.
Coolest row this session is DDR4 16Gb (2Gx8) 3200 at -1.57% over 30 days; the hottest is Retail DDR5 64GB Kit (2x32, 6000 CL30) at +32.04%. Dies are still printing positive, so the cycle has not turned — on this data, waiting is still costing money. Retail is running hotter than the die board, which is typical late in an upswing as channel inventory reprices.
Supply and demand timeline
What has to physically happen before prices can fall, and roughly when.
- Now — next 2 quartersContract prices keep resetting upward
TrendForce's quarterly contract assessments have run positive for consecutive quarters across server DRAM and enterprise SSD. Contract settlements lag spot, so today's spot level is already inside next quarter's contract print.
- Next 2 — 4 quartersNew wafer capacity begins tool-in
Samsung, SK hynix and Micron have all guided to higher DRAM capex, but tool-in is not output. Equipment installed today converts to shipped bits roughly four to six quarters later, and yields ramp gradually behind that.
- Next 4 — 7 quartersHBM4 ramp decides how many bits reach commodity DRAM
HBM consumes roughly three times the wafer area per shipped bit versus standard DDR5. If HBM4 qualification volumes land at the high end of supplier plans, incremental wafers are absorbed there and commodity relief slips further out.
- Next 7 — 9 quartersGreenfield fab output reaches meaningful scale
The full greenfield cycle — shell, tool-in, qualification, yield ramp — is seven to nine quarters. This is the earliest window in which supply, rather than demand destruction, ends the cycle.
- Wildcard, any quarterAI accelerator order pullback
The fastest possible unwind. Cancelled or deferred accelerator orders free HBM-allocated capacity back to commodity DRAM within a quarter or two — far faster than any fab can. Watch hyperscaler capex commentary, not memory suppliers.
Four ways this cycle can end
Each scenario has a distinct tell in the table above — that is what to watch, rather than a forecast date.
| Scenario | Trigger | Timing | Shape | Tell in the data |
|---|---|---|---|---|
| Grind higher | AI demand holds, new wafers keep going to HBM | No relief inside 4 quarters | Spot keeps printing positive 30-day; retail follows with a 4–8 week lag | Die rows below stay positive on 30-day while eTT–branded spread stays wide |
| Plateau | Demand flattens, first new capacity qualifies | 2–4 quarters | 30-day change compresses toward zero before it turns negative; contract lags a quarter | Die-level 30-day drops below the retail 30-day — spot cools first |
| Supply-led unwind | Greenfield output lands while HBM mix normalises | 5–9 quarters | Sustained negative die prints, then modules, then retail kits | Three or more consecutive negative die readings across DDR5 and DDR4 |
| Demand shock | AI accelerator orders cut or deferred | 1–2 quarters | Fastest and sharpest; HBM-allocated wafers flood back to commodity DRAM | HBM rows stall while DDR5 die 30-day rolls over in the same window |
Timing ranges are our reading of publicly reported fab lead times and supplier capex guidance, not a vendor forecast. See methodology for how each row is sourced, and why RAM prices are so high for the causes behind the current level.
Latest supply-chain news
All chip news ↗- HBMUpside risk
TrendForce: server RDIMM contract prices rise; HBM4 supply for next year reported sold out
The 4 Nov bulletin says server DRAM contract prices rose, with RDIMM increases varying by capacity. SK hynix and Samsung results showed DRAM volume and price both up; SK hynix's HBM4 is set to overtake HBM3E with next year's volume and price agreed, and Samsung says next year's supply is sold out. Suppliers are raising long-term-agreement share with floor prices, volume commitments and prepayments.
TrendForce DRAM Market Bulletin ↗ - DRAMUpside risk
TrendForce sees Q4 DRAM contract prices up 10-15% and NAND up 15-20% as spot trade stalls
TrendForce expects conventional DRAM contract prices to rise 10-15% quarter on quarter in Q4 and NAND contract prices 15-20%. On the 2 Nov spot board DDR4 16Gb averaged $82.719 (-0.09%) and DDR5 16Gb was unchanged at $61.50.
Capital Times citing TrendForce ↗ - NANDDownside risk
Weekly spot: DDR4 1Gx8 dips 0.09% to $46.82; 512Gb TLC NAND wafers fall 4.33%
DDR4 spot sits above suppliers' official quotes amid weak end demand, so buyers expect a correction and volume has shrunk; DDR5 buyers raised some targets under delivery pressure. 512Gb TLC wafer spot fell 4.33% after a 9.19% drop the week before, with Double 11 discounts not expected to revive demand.
TrendForce weekly memory spot-price update ↗ - DRAMMarket data
22 Oct spot board: DDR5 16Gb averages $61.10; DDR4 16Gb flat at $83.117
DDR5 16Gb 4800/5600 averaged $61.100 (+0.38% session) and eTT $28.800 (+0.70%). DDR4 8Gb 3200 rose 0.46% to $47.000 while DDR4 16Gb 3200 was unchanged at $83.117. TrendForce describes trading as quiet, with some suppliers edging quotes down and buyers unwilling to purchase.
DRAMeXchange / TrendForce spot board ↗
Keep digging
- Full memory chip price tracker
- Live memory prices (all contracts)
- Semiconductor prices (Beta)
- DRAM prices — spot & contract
- RAM prices & RAM price chart
- DDR5 price tracker
- DDR4 price tracker
- HBM price tracker
- HBM memory price chart
- HBM3E price per stack
- HBM4 price per stack
- HBM3 price per stack
- LPDDR5X & mobile DRAM prices
- NAND flash prices
- SSD prices & $/TB
- MemoryIndex composite price index
- Why are RAM prices so high?
- When will RAM prices go down?
- HBM vs DRAM price comparison
- DRAM vs NAND prices
- HBM3 vs HBM3E vs HBM4
- Samsung vs SK hynix vs Micron
- Memory manufacturer leaderboard
- AI company leaderboard
- Methodology & data sources
FAQ
- When will RAM prices go down?
- Not on a schedule anyone can promise. The binding constraint is bit supply: a greenfield DRAM fab takes roughly seven to nine quarters from tool-in to meaningful output, and much of the new capacity is earmarked for HBM. Until those bits land or AI accelerator demand cools, the structural pressure stays.
- What is the first sign that RAM prices are falling?
- Spot before contract, dies before modules. A sustained negative 30-day print on the DDR5 and DDR4 die rows in the table above is the earliest reliable signal; retail kit prices follow four to eight weeks later. One negative week is noise — look for several consecutive readings across multiple dies.
- Should I buy RAM now or wait?
- Look at the 30-day column above rather than a forecast. While die-level 30-day change is still positive across the basket, waiting has historically cost more than buying. When the die rows turn negative and stay negative, waiting starts to pay.
- Could DDR4 prices come back down?
- DDR4 is the least likely to normalise, because the supply reduction is permanent: nodes being retired do not come back. End-of-life memory nodes historically stay expensive and get scarcer rather than cheaper.
- What would break the cycle fastest?
- A pullback in AI accelerator orders would free HBM-allocated capacity back to commodity DRAM faster than any new fab. That is why the chip news and AI company capex pages here are worth watching alongside the price table.
- How long do memory down-cycles usually take to arrive?
- Historically the turn comes two to four quarters after suppliers add wafer capacity faster than bit demand grows — the 2018-19 and 2022-23 downturns both followed that pattern. The difference this cycle is that a large share of incremental wafers is consumed by HBM, which uses roughly three times the die area per shipped bit, so the same wafer additions deliver fewer commodity bits.
- Will DDR5 fall before DDR4?
- Almost certainly. DDR5 sits on leading-edge nodes that suppliers are actively expanding, so new bits land there first. DDR4 supply is being retired rather than added, which is why its 30-day and year-over-year prints on this page keep running ahead of DDR5.